Comprehensive Wastewater/Nutrient Management Plan
Document | Description |
|---|
| | | Please note that the Citizens Advisory Committee was disbanded by unaminous vote of the Board of Selectmen on June 1, 2010 at the completion of the Committees charge, with thanks for their extraordinary efforts. | | |
Project Newsletters Document | Description |
|---|
| May 2009 Project Newsletter mailed to all households in Chatham. | | April 2008 Project Newsletter mailed to all households in Chatham. | | September 2004 Project Newsletter mailed to all households in Chatham. | | | | |
This is a list of Frequenlty Asked Questions and Responses on the Wastewater Project. Wastewater Construction Project Updates Document | Description |
|---|
| This is a large file due to the graphics. It may be slow to load on some systems | | This is a large file due to the graphics. It may be slow to load on some systems | | This is a large file due to the graphics. It may be slow to load on some systems | | This is a large file due to the graphics. It may be slow to load on some systems |
Business Sign Code Relief Document | Description |
|---|
| The Board of Selectmen have adopted a Policy that provides relief from the sign code regulations pertaining to "off-premise" signs for businesses affected by the sewer construction. See the attached document for more information. |
Community Septic Management Loan Program Document | Description |
|---|
| Financial help with a 5% interest rate betterment loan is available through the Barnstable County Community Septic Management Loan Program. Eligible projects include replacing "failed" septic systems, including alternative septic systems and sewer hook-ups. |
Adaptive Management Plan Final Comprehensive Wastewater Management Plan/Final Environmental Impact Report Document | Description |
|---|
| This is a PDF version of the Final Comprehensive Wastewater Management Plan / Final Environmental Impact Report dated May 2009. | | This is a PDF of the Certificate. | | This is a link to the Cape Cod Commission's Decision on the Final Comprehensive Wastewater Management Plan Development of Regional Impact Filing | | This is a PDF of the letter. |
Fiscal Document | Description |
|---|
| Report to the Board of Selectmen from Robert J. Ciolek | | See also next file containing the attachments referenced in this presentation. This is a PDF file of a PowerPoint presentation, due to the graphics it may be slow to load on some systems. | | This is a PDF file, due to the file size it may be slow to load on some systems. | | This is a PDF file of a PowerPoint presentation, due to the graphics it may be slow to load on some systems. | | This is a PDF file of a PowerPoint presentation, due to the graphics it may be slow to load on some systems. | | This is a PDF file of a PowerPoint presentation, due to the graphics it may be slow to load on some systems. | | This is a PDF file of a PowerPoint presentation, due to the graphics it may be slow to load on some systems. | | This is a PDF file of a PowerPoint presentation, due to the graphics it may be slow to load on some systems. |
Massachusetts Estuaries Project Scientific Peer Review Document | Description |
|---|
| | | | | This is a letter from the Cape Cod Water Protection Collaborative containing background information on the Peer Review Panel charge, process, and panel member qualifications. |
Massachusetts Estuaries Project Reports Total Maximum Daily Load (TMDL) - webpage with links to nitrogen TMDL reports and associated materials. This is a PDF version of the Draft of the Comprehensive Wastewater Management Plan / Environmental Impact Report dated April 2008. Document | Description |
|---|
| This is a PDF file of a PowerPoint presentation, due to the graphics it may be slow to load on some systems. | | This is a PDF file of a PowerPoint presentation, due to the graphics it may be slow to load on some systems. | | | | This Project Scope & Work Plan is from Appendix 1-1 of the DRAFT Supplemental Needs Assessment Report that was not finalized (it has been superceded by the Draft CWMP/EIR to be issued in summer 2007). The Scope as presented in Appendix 1-1 is adapted from the original project scope issued in 1997. |
Barnstable County Reports Document | Description |
|---|
| Link to Cape Cod Water Protection Collaborative webpage with access to multiple reports dealing with wastewater management on Cape Cod. | | Link to a report prepared by the Barnstable County Wastewater Cost Task Force | | This is a large report with extensive graphics, it has been posted as sections to make downloading easier. | | A report prepared by the Barnstable County Department of Health and Environment | | | | |
MIscellaneous Reports and Documents Document | Description |
|---|
| | | | | | | | | This report documents the results of a literature search conducted for DEP on the state of knowledge on the natural attenuation of nitrogen in wetland systems of various types and its applicability in dealing with stormwater and wastewater sources of nitrogen. | | | | | | | | | | | | PowerPoint presentation by George Heufelder, Barnstable County Dept. of Health & Environment, Wastewater Forum, October 2009 | | PowerPoint presentation by Robert Duncanson, Ph.D., Town of Chatham Director of Health & Environment, Wastewater Forum, October 2009 | | PowerPoint presentation by NathanC. Weeks, P.E., Stearns & Wheler Consultants, Wastewater Forum, October 2009 | | | | | | | | |
| |