Draft CWMP/DEIR Report Tables as individual pdf files.
Table |
Description |
|
Summary of major findings and Recommendations for Chatham Ponds
|
|
Summary of Wastewater nitrogen Removal Needs to Meet the nitrogen TMDLs
|
|
Existing WWTF Flows (2002-2005) & Peaking Factors
|
|
Town-Wide Wastewater flow Estimates (not including Infiltration and Inflow) & Infiltration and Inflow Estimate
|
|
Total Estimated Flows for a Town-wide Wastewater Collection and Treatment System & Existing WWTF Flows and Loadings (2002 - 2005)
|
|
Total Estimated Flows and Loadings for a Town-wide Wastewater Collection and Treatment System
|
|
South Coastal Bay Nitrogen Loads
|
|
South Coastal Embayments Treshold Septic Loads
|
|
Present Controllable Watershed nitrogen Loading Rates
|
|
South Coastal Embayments TMDLs
|
|
Pleasant Bay Watershed Nitrogen Loads (Relative to Chatham)
|
|
Pleasant Bay Watershed Threshold Septic Loads
|
|
Pleasant Bay System Loading Capacities (Chatham Related Sub-Embayments Only)
|
|
Draft Pleasant Bay System TMDLs (Chatham Related Sub-Embayments Only)
|
|
Embayment Septic Percent Nitrogen Removals
|
|
Summary of Advanced/Secondary Treatment Technologies
|
|
Summary of Disinfection Technologies
|
|
Summary of Sludge Processing and Disposal Alternatives
|
|
Summary of Collection System Technologies
|
|
Embayment AOCs Estimated number of Vacant Properties (By State Class Code)
|
|
Estimated Wastewater Facility Site Capacity
|
|
Summary of Decentralized Treatment Technologies
|
|
Summary of Treated Water Recharge Technologies
|
|
Site Identification
|
|
Site Evaluation Matrix
|
|
Town of Chatham 2007 Sewer Rate Schedule
|
|
Estimated Capital Costs for Town-wide Collection System
|
|
Estimated Sewer Costs per Sewershed
|
|
Cost Estimate for Chatham WWTF Improvements
|
|
Cost Estimate for Treated Water Recharge Beds
|
|
Alternative #2 Estimated Cost of the Combination Alternative for Watersheds
|
|
Phase 1 and 2 WWTF Design Flows
|
|
Inventory of Existing and Proposed Facilities and Process Equipment
|
|
Sewersheds Necessary to Achieve TMDL Goals
|
|
Sewershed Estimated Wastewater Flows and Capital Costs
|
|
Total Present Worth Comparision Five Watersheds Alternative #2 vs. Connection to the WWTF
|
|
Endangered, Threatened, or Species of Special Concern in the Town of Chatham
|
|
Cultural and Natural Resources within Sewersheds
|
|
Environmental Impact Assessment
|
|
Recommended Plan Cost Summary - Table Corrected 5-20-08
|
|
Estimated Sewer Construction and Connection Cost per Property
|