| Summary of Major Findings and Recommendations for Chatham Ponds |
| Summary of Wastewater Nitrogen Removal Needs to Meet the Nitrogen TMDLs |
| Existing WWTF Flows (2002-2005) & Peaking Factors |
| Town-Wide Wastewater Flow Estimates (not including Infiltration and Inflow) & Infiltration and Inflow Estimate |
| Total Estimated Flows for a Town-wide Wastewater Collection and Treatment System & Existing WWTF Flows and Loadings (2002-2005) |
| Total Estimated Flows and Loadings for a Town-wide Wastewater Collection and Treatment System |
| South Coastal Bay Nitrogen Loads |
| South Coastal Embayments Threshold Septic Loads |
| Present Controllable Watershed Nitrogen Loading Rates |
| South Coastal Embayments TMDLs |
| Pleasant Bay Watershed Nitrogen Loads (Relative to Chatham) |
| Pleasant Bay Watershed Threshold Septic Loads |
| Pleasant Bay System Loading Capacities (Chatham Related Sub-Embayments Only) |
| Pleasant Bay System TMDLs (Chtham Related Sub-Embayments Only) |
| Embayment Septic Percent Nitrogen Removals |
| Summary of Advanced/Secondary Treatment Technologies |
| Summary of Disinfection Technologies |
| Summary of Sludge Processing and Disposal Alternatives |
| Summary of Collection System Technologies |
| Embayment AOCs Estimated Number of Vacant Properties (By State Class Code) |
| Estimated Wastewater Facility Site Capacity |
| Summary of Decentralized Treatment Technologies |
| Summary of Treated Water Recharge Technologies |
| |
| |
| Town of Chatham 2007 Sewer Rate Schedule |
| Estimated Capital Costs for Town-wide Collection System |
| Estimated Sewer Cost per Sewershed |
| Cost Estimate for Chatham WWTF Improvements |
| Alternative #2 Estimated Costs of the Combination Alternative for Watersheds |
| Phase 1 and 2 WWTF Design Flows |
| Inventory of Existing and Proposed Facilities and Process Equipment |
| Sewersheds Necessary to Achieve TMDL Goals |
| Sewershed Estimated Wastewater Flows and Capital Costs |
| Total Present Worth Comparision Five Watersheds Alternative #2 vs. Connection to the WWTF |
| Endangered, Threatened, or Species of Special Concern in the Town of Chatham |
| Cultural and Natural Resources within Sewersheds |
| Environmental Impact Assessment |
| Recommended Plan Cost Summary |