Draft CWMP / DEIR Report Tables
- Table 2-1 (PDF)
Summary of major findings and Recommendations for Chatham Ponds - Table 2-2 (PDF)
Summary of Wastewater nitrogen Removal Needs to Meet the nitrogen TMDLs - Tables 2-3 and 2-4 (PDF)
Existing WWTF Flows (2002 to 2005) and Peaking Factors - Tables 2-5 and 2-6 (PDF)
Town-Wide Wastewater flow Estimates (not including Infiltration and Inflow) and Infiltration and Inflow Estimate - Tables 2-7 and 2-8 (PDF)
Total Estimated Flows for a Town-wide Wastewater Collection and Treatment System and Existing WWTF Flows and Loadings (2002 to 2005) - Table 2-9 (PDF)
Total Estimated Flows and Loadings for a Town-wide Wastewater Collection and Treatment System - Table 4-1 (PDF)
South Coastal Bay Nitrogen Loads - Table 4-2 (PDF)
South Coastal Embayments Threshold Septic Loads - Table 4-3 (PDF)
Present Controllable Watershed nitrogen Loading Rates - Table 4-4 (PDF)
South Coastal Embayments TMDLs - Table 4-5 (PDF)
Pleasant Bay Watershed Nitrogen Loads (Relative to Chatham) - Table 4-6 (PDF)
Pleasant Bay Watershed Threshold Septic Loads - Table 4-7 (PDF)
Pleasant Bay System Loading Capacities (Chatham Related Sub-Embayments Only) - Table 4-8 (PDF)
Draft Pleasant Bay System TMDLs (Chatham Related Sub-Embayments Only) - Table 4-9 (PDF)
Embayment Septic Percent Nitrogen Removals - Table 5-1 (PDF)
Summary of Advanced/Secondary Treatment Technologies - Table 5-2 (PDF)
Summary of Disinfection Technologies - Table 5-3 (PDF)
Summary of Sludge Processing and Disposal Alternatives - Table 5-4 (PDF)
Summary of Collection System Technologies - Table 6-1 (PDF)
Embayment AOCs Estimated number of Vacant Properties (By State Class Code) - Table 6-2 (PDF)
Estimated Wastewater Facility Site Capacity - Table 6-3 (PDF)
Summary of Decentralized Treatment Technologies - Table 7-1 (PDF)
Summary of Treated Water Recharge Technologies - Table 7-2 (PDF)
Site Identification - Table 7-3 (PDF)
Site Evaluation Matrix - Table 8-1 (PDF)
Town of Chatham 2007 Sewer Rate Schedule - Table 9-1 (PDF)
Estimated Capital Costs for Town-wide Collection System - Table 9-2
Estimated Sewer Costs per Sewershed - Table 9-3 (PDF)
Cost Estimate for Chatham WWTF Improvements - Table 9-4 (PDF)
Cost Estimate for Treated Water Recharge Beds - Table 9-5 (PDF)
Alternative Number 2 Estimated Cost of the Combination Alternative for Watersheds - Table 9-6 (PDF)
Phase 1 and 2 WWTF Design Flows - Table 9-7
Inventory of Existing and Proposed Facilities and Process Equipment - Table 9-8 (PDF)
Sewersheds Necessary to Achieve TMDL Goals - Table 9-9 (PDF)
Sewershed Estimated Wastewater Flows and Capital Costs - Table 9-10 (PDF)
Total Present Worth Comparison Five Watersheds Alternative Number 2 versus Connection to the WWTF - Table 10-1 (PDF)
Endangered, Threatened, or Species of Special Concern in the Town of Chatham - Table 10-2 (PDF)
Cultural and Natural Resources within Sewersheds - Table 10-3 (PDF)
Environmental Impact Assessment - Table 11-1 (PDF)
Recommended Plan Cost Summary (Table Corrected May 20, 2008) - Table 11-2 (PDF)
Estimated Sewer Construction and Connection Cost per Property