Information

General Project Information

Phase 1D-2A: Route 137 - Morton Road (Contract 2019-CWMP-1)

Project Name: Phase 1D-2A: Route 137 - Morton Road Sewer Extension Project

Contract No.: 2019-CWMP-1

CWSRF No.: 4516

Contractor: C.C. Construction Inc.

Engineer: GHD Inc.


Phase 1E-2: Crowell Road Phase 2 and Chatham Fish Pier Project (Contract 2021-CWMP-2)

Project Name: Crowell Road Phase 2 and Chatham Fish Pier Infrastructure Project

Contract No.: 2021-CWMP-2

CWSRF No.: 6772

Contractor: N&M Excavating LLC

Engineer: GHD Inc.


Phase 1E-Stony Hill/Crowell Road (Contract 2019-CWMP-3)

Project Name: Stony Hill / Crowell Road Infrastructure Project

Contract No.: 2019-CWMP-3

CWSRF No.: 4516

Contractor: Robert B. Our Co.

Engineer: GHD Inc.


Phase 1D-1 (Contract 2018-CWMP-4)

Project Name: Chatham-Harwich Regionalization Connection Project

Contract No.: 2018-CWMP-4

CWSRF No.: 4430

Contractor: Robert B. Our Co.

Engineer: GHD Inc.


Phase 1C-3&4 (Contract 2018-CWMP-2)

Project Name: Oyster Pond Sewer Extension

Contract No.: 2018-CWMP-2

CWSRF No.: 3795

Contractor: C.C. Construction Inc.

Engineer: GHD Inc.


The following link is to the Town of Harwich web page for information about their sewer project - you will be redirected to another site and any questions regarding information on that site should be refered to the Town of Harwich.  https://www.harwich-ma.gov/health/pages/sewer-information