Final Comprehensive Wastewater Management Plan, May 2009

This site contains pdf files of all report text, by chapter, tables, figures and appendices.

Section

File Size and Description

Note to Readers

Note to Readers

Volume 1 Cover

Volume 1 Cover

Inside Cover

Inside Cover

Transmittal Letter

CWMP/FEIR Transmittal Letter to Secretary of Energy & Environmental Affairs

Distribution List

List of Agencies and individuals required to receive the document

Executive Summary

This is the Executive Summary of the Final Document

Table of Contents

Table of Contents

Acknowledgements

Acknowledgements

Acronyms

Acronyms - common terms used in the Report

Chapter 1

Introduction

Chapter 2

Summary of Previous Documents Prepared fo the Chatham CWMP

Chapter 3

Public Participation Program

Chapter 4

Massachusetts Estuaries Project and Nitrogen Limit Development

Chapter 5

Centralized Wastewater Evaluations

Chapter 6

Decentralized Wastewater Evaluations

Chapter 7

Summary of Evaluations for Treated Water Recharge/Reuse

Chapter 8

Flow and Loading Reduction and Non-Wastewater Nitrogen Mitigation Alternatives

Chapter 9

Identification and Evaluation of Alternative Management Plans

Chapter 10

Summary of Environmental Impact Analysis

Chapter 11

Summary of Recommended Plan

Chapter 12

MEPA Draft Section 61 Findings and Mitigation Measures

References

References

Tables

Report Tables - Individual pdf files of each report Table. Due to the size of some tables download times may be extended.

Figures

Report Figures - Individual pdf files of each report Figure. Due the size of some figures download times may be extended.

Appendix A-1

October 29, 1999 Certificate of the Secretary of Executive Office of Environmental Affairs (EOEA)

Appendix A-2

April 9, 2004 Certificate of the Secretary of Executive Office of Environmental Affairs (EOEA) on Notice of Project Change

Appendix A-3

June 13, 2008 Certificate of the Secretary of the Executive Office of Energy and Environmental Affairs (EOEEA) Draft EIR/Facilities Plan, 2nd Notice of Project Change

Appendix B

April 21, 2009 Memorandum Comments on June 13, 2008 DCWP/DEIR and NPC Certificate

Appendix C

Action Plan for the Town of Chatham Ponds, November 2003

Appendix D

Technical Memorandum on findings ofUSGS Modeling for Effluent Recharge Alternatives and Effects on a Landfill Plum, July 2005, and Preliminary USGS Particle Track Figures 1-7

Appendix E

Infiltration Loading Test Report, July 2006

Appendix F

Treated Water Recharge Site Evaluations, June 2007

Appendix G

Technical Memorandum on Groundwater Modeling, June 2007, and MassDEP Review Letter dated December 2006

Appendix H

Administrative Consent Order with DEP, September 1998

Appendix I

Public Outreach Flyers

Appendix J

Cockle Cove Salt Marsh Nitrogen Threshold Technical Memorandum and Response to Comments

Appendix K

Analysis of Coastal Processes for the Chatham South Coast Between Mill Creek and Bucks Creek

Appendix L

Bucks Creek: Wastewater Modeling Scenarios

Appendix M

Centralized Wastewater Collection and Treatment Technology Descriptions

Appendix N

Decentralized Wastewater Technology Descriptions

Appendix O

Voluntary National Guidelines for Management of Onsite and Clustered Wastewater Treatment Systems

Appendix P

Treated Water Recharge Technologies

Appendix Q

Groundwater Modeling/Particle Track Figures

Appendix R

Rules and Regulations of the Sewer Department

Appendix S

"Nitrogen Loading Regulation", May 11, 2006

Appendix T

WWTF Site USDA Letters (Wildlife, Historic, etc.)

Appendix U

PreliminarySewershed Layouts

Appendix V

Town of Chatham 2005 Fiscal Analysis

Appendix W

Town of Chatham 2006 Fiscal Analysis

Appendix X

Groundwater Monitoring Program Items

Appendix Y-1

Technical Memorandum February 11, 2009 Evaluation of Alternative Methods to Address MassDEP's Proposed Regulations for TOC Limits

Appendix Y-2

Meeting Notes MassDEP Progress Meeting March 20, 2009

Appendix Z

Water Quality Monitoring Items